One of our newest urban renewal projects is well underway at Lot 301, 15 Military Road, Midland, within the City of Swan.
A site with a long industrial history
The site began life as an abattoir before being converted into a brick production facility. Decades of continuous industrial use have left behind five major buildings, several smaller structures, extensive below ground infrastructure and areas of uncontrolled fill, all of which need to be carefully removed before the land can move into its next chapter.
The site’s location adds a further layer of complexity. Sitting adjacent to the Helena River, the project demands strong environmental controls across every stage of the works to ensure no damage is caused by any activity on site.
Site establishment and management
Our scope begins with the establishment and management of the site, including close coordination with neighbouring businesses, government agencies, utility providers and the Principal’s environmental consultant. Alongside this, the team is implementing statutory management plans, traffic management, dust control measures and temporary fencing while protecting existing services and retained trees.
Demolition
Demolition works are being delivered in a carefully sequenced programme. Appropriately licensed contractors are safely removing all hazardous materials, including asbestos, ahead of the complete demolition of the five major buildings and the smaller structures across the site.
The works also cover the removal of all below ground structures, services, vegetation, waste and foundations to generally two metres below finished surface level, including the decommissioning of septic systems and the disconnection of utility services.
Earthworks and site stabilisation
Site earthworks encompass the excavation and disposal of uncontrolled fill, sludge, waste and debris at approved facilities. Excavated areas, settlement ponds and deep fill zones will then be backfilled using suitable material sourced from the site, with recycled materials used where appropriate.
Final decommissioning activities include crushing and reusing suitable site material, removing any remaining underground infrastructure, trimming the site to the specified earthworks levels and stabilising the site once the works are complete.