Construct Tailings Dam Facility
Laverton, Western Australia
Gold Fields
20 Weeks
2018

Description of Works

RJV Mining Services was awarded the Granny Smith Cell Stage Raise and Earthwork closure packages by Gold Fields Australia.

Scope of Services

  • Raising existing embankment on tailings storage cell
  • Construction of new embankment sections including winning, loading, hauling and final placement of suitable material from borrow
  • Raising decant causeway and tower

Equipment

  • 85t excavators
  • 40t excavators
  • 30t excavators 
  • 50t Artic dump trucks
  • Cat D10 dozers
  • Cat D6 dozers
  • 14m Cat graders
  • 45t Artic water cart

Key Challenges

  • Managing tyres due to the 12km long haul selecting the correct TKPH for the dump trucks.  The in-situ material was extremely hard on the equipment tyres.
  • Height of the dam wall meant a long up uphill haul which meant that operators required training to operate the trucks correctly.
  • Construction water was available only at the top of the dam wall which meant that smaller water trucks had to be used due to the width limitations.

RJV Advantage

  • Personalised service which is flexible and agile and can quickly adapt to changing programme requirements to ensure the project stayed on track
  • Family business with many long-term employees who are connected to the business and the company’s mission and values bringing continuity and expertise to the projects 
  • Team orientated environment with few layers of decision making

Innovation

The project was the catalyst for an operator training program implemented across the RJV business.

Safety Record

Zero lost time injuries.